Showing posts sorted by relevance for query tRAILS master plan. Sort by date Show all posts
Showing posts sorted by relevance for query tRAILS master plan. Sort by date Show all posts

Wednesday, November 5, 2025

Oro Valley Trails Plan is 60% Complete — Your Voice Still Matters

Oro Valley Trails Connect Master Plan continues to take shape
Oro Valley’s OV Trails Connect Master Plan is the Town’s first comprehensive effort since 2010 to evaluate, upgrade, and expand its network of unpaved trails and paved paths. The Town’s trails and paths are a key feature of our community, used by residents and visitors alike. Once approved by the Town Council, the plan will serve as a guide for maintaining and expanding Oro Valley’s trail system. 

How the process began
The study began in early 2025 with surveys, stakeholder meetings, and “trailside chats” that gathered input from hundreds of residents about how they use and value local trails. Earlier discussions focused on developing a shared vision and identifying key priorities such as connectivity, maintenance, and safety.

Public input shapes the 60% draft
Since those initial discussions, Town staff and consultant Kimley-Horn have broadened public involvement through additional meetings with residents, stakeholders, and regional partners. According to staff, participants have provided comments on the Town’s paved path and unpaved trail assets, as well as feedback on the draft vision and guiding principles.

Four areas of focus

The plan is now organized around four focus areas, each representing a key part of Oro Valley’s trail and path network:
  • Unpaved trails:  Natural-surface trails such as those in Big Wash, Honey Bee Canyon, and other open-space areas.
  • Multi-use paths (MUPs):  Paved paths located along or separate from major roadways, including those on La Cholla, Tangerine, and Naranja.
  • The Loop within Oro Valley: The portion of the regional Pima County Loop system that runs through the Town.
  • Paths at the Vistoso Trails Nature Preserve: The paved paths within the Preserve, including its main concrete trail network and access points.
In the draft, each focus area include proposed improvements and priority action tables that link community feedback to specific projects.

Amenities and partnerships added to the discussion
The plan gives attention to accessibility and user comfort, calling for amenities such as restrooms, benches, shade, and ADA-compliant trailheads. It also begins to outline strategies for partnerships, volunteer programs, and grant funding to support long-term maintenance and future expansion.

Challenges that remain
Even with the progress reflected in the 60% draft, several challenges remain unresolved. The plan still does not specify how proposed improvements will be funded or maintained, offering no dedicated funding source or staffing plan for ongoing upkeep. Coordination with the State Land Department on future trail easements—especially in areas north of Big Wash—remains undefined. While the document outlines safety and etiquette goals, it lacks detail on enforcement and accountability. Environmental considerations, such as habitat protection and trail impact assessments, are addressed only broadly, with no clear standards or procedures. Finally, the plan does not yet establish measurable performance goals or timelines to track whether future trail expansion and maintenance efforts achieve their intended results.

Time to get involved
The 60% draft marks the first time Oro Valley’s OV Trails Connect Master Plan has been presented as a complete document for public and advisory review. Following input from the Parks and Recreation Advisory Board, the draft will go to the Town Council in mid-November for additional feedback. Staff and the consultant will then refine the plan and share a final version with residents and regional partners early next year. The Town expects to bring the completed plan back to the Board and Council for approval in the spring of 2026. 

Because Oro Valley’s trails and paths are an essential part of the community’s quality of life, supporting recreation, health, and connection to nature, we encourage you to review the plan, share you thoughts to help shape the future of this community asset. 

“Throughout this process, the community is invited to www.OVTrailsConnect.com to sign up for the Trails Stakeholder Group, stay informed about the latest materials and information, and reach out to Senior Planner Kyle Packer (kpacker@orovalleyaz.gov) with comments and questions.”
- - -

Wednesday, December 3, 2025

Council Makes Major Suggestions for the Trails Connect Master Plan

Council weighs in on trails master plan
Several weeks ago, LOVE reported that Oro Valley’s OV Trails Connect Master Plan is now 60 percent complete and ready for public and advisory review. That article summarized the plan’s structure, priorities, and the challenges that remain, including the lack of a dedicated funding strategy and questions about long-term maintenance. Staff presented the same 60 percent draft at the November 19 Town Council meeting. That discussion resulted in several significant Council suggestions that could shape the plan’s next version.

Council wants trails to be a major tourism focus
The most significant theme of the Council discussion was the clear link between trails and tourism. Councilmembers emphasized how important outdoor recreation has become for visitor spending, hotel activity, and Oro Valley’s identity. They encouraged staff to elevate trails and multi-use paths as core tourism assets, integrate them into the Explore OV platform, and ensure that maps and information are easily available in hotels, resorts, and bike shops.

Volunteer programs should support short-term priorities
Councilmembers repeatedly stated that volunteer programs should be treated as a short-term action, not a mid-term item. Oro Valley’s volunteer culture is strong, they noted. Council wants to mobilize residents quickly for tasks such as trail maintenance, mapping, outreach, and small-scale improvements. This direction would shift how implementation is phased in the next draft.

A northern Loop extension toward Saddlebrooke and Biosphere 2 is being studied
A surprising element of the discussion was that Pima County and regional partners are exploring a northern extension of The Loop that could eventually reach Saddlebrooke and even Biosphere 2. Councilmembers saw this as a major long-term opportunity and suggested that the Trails Plan acknowledge and plan for regional connectivity.

Rancho Vistoso Boulevard identified as a future multi-use path corridor
Vice Mayor Barrett highlighted Rancho Vistoso Boulevard as a location where residents already walk and cycle in large numbers. She suggested that the Town consider adding a multi-use path along this roadway to improve safety and enhance connections to Vistoso Trails Nature Preserve. This was not in the original 60 percent draft but received support during discussion.

Stronger partnerships needed to legitimize and expand trails
Council encouraged staff to work more actively with HOAs, homeowners, trail groups, and local local businesses to secure legal access for certain “informal” trails. Members suggested preparing a stakeholders-only map identifying where approvals are needed and who might help obtain them. This reflects a shift toward more community-driven trail expansion.

Better integration with mapping and navigation apps needed
Councilmembers suggested that the Town use mapping platforms more effectively, including Strava, AllTrails, and Apple mobility data. They encouraged staff to ensure that Oro Valley trail maps appear in the Town’s Explore OV app and in apps that residents and visitors already use. Better visibility, they said, would improve both safety and tourism value.

Recognize regional mountain biking assets
Some Councilmembers suggested adding references to the 50-Year Trail and other nearby mountain biking areas that, while not located in Oro Valley, draw riders who often stay and shop in Town. They viewed these as regional assets that complement the Town’s own network.

Implementation should emphasize low-cost “quick wins”
Several members pointed to small actions that can be completed quickly, such as better printed maps at hotels and bike shops, trail-day events, and clearer wayfinding signs on existing paths. These short-term improvements were seen as a way to build momentum before larger, more expensive projects begin.

90% version is up next… final version next spring
Staff will use Council’s direction to revise the plan, prepare a 90 percent draft, and share it with the public and regional partners early next year. A final version will return to Town Council in the spring of 2026 for possible approval.
- - -

Monday, March 20, 2023

Council Guides Staff on Vistoso Trails Nature Preserve Master Plan: "Keep It Simple... Revegetation Is The Priority"

The Oro Valley Town Council provided direction last Wednesday regarding the Vistoso Trails Nature Preserve Master Plan.  The direction was provided during a study session with town staff and with consultant to the project. 

Keep it simple
The council wants the Preserve to be a place for relaxation, nature, and reasonable exercise. They don't want it to be a park that attracts a large volume of traffic. The council agreed that they need to know the traffic impact of each option in order to provide further guidance.

Get revegetation started sooner rather than later
The most important aspect of creating the Preserve is to return the greens and fairways to their natural state. This means planting native plants and eliminating the invasive species that are taking over the area. This is called "revegetation." Removing as much of the Bermuda grass as possible is a challenge as that grass is much like a weed. It's hard to kill. The longer the town waits to revegetate, the more difficult and the more costly it will be to do so. The proposed plan is to rip out the greens and fairways and to apply a seed mix of grass and straw. Revegetation is part of Phases 1 and 2 of the consultant's implementation plan.

Do something about the pond
...but don't make it too complicated. The simplest alternative seems to be what the consultant noted as Option C (see panel right). This is a smaller pond with sloped sides to allow leisurely access. The pond would use reclaimed water. 

Note: There is a simpler option that neither the consultant, town staff, nor the council discussed. That option is to fill in the area and revegetate it. That would return that area to its natural state.

Get a handle on cost of creating and maintaining the Preserve
Council wants to know the cost of building and of maintaining all options so that they can make an informed decision. "We need some reasonable estimates for the construction and maintenance," noted Council Member Solomon. "Is this going to be something that is going to start taking a big percentage of the Parks and Recreation budget?" Parks and Recreation Director Diaz-Trahan replied that it would be less costly than maintaining similar acreage at Naranja Park. Regarding cost of implementing, staff consistently mentioned getting grants but has provided no details.

Allow both walking and biking
The cart paths on the Preserve are not sufficiently wide for both foot and bike traffic. Also, they are not wide enough to meet ADA compliance. Town staff does not think it can enforce a "no bike" policy. Most on Council don't want to keep bikers out anyway. Some path widening will need to occur in the future. In addition, the town will need to add special ADA paths to allow all to enjoy the Preserve experience.

Involve the entire community
Residents of Rancho Vistoso donated $1.8million to The Conservation Fund for the purchase of the property. Some council members suggested that the opinion of these people should be weighed more heavily that the opinion of those who live outside the area. Mayor Winfield did not agree. He expressed the view of a majority: The investment that the town will make in this property will vastly exceed the amount contributed. Therefore, the town should weigh the thoughts of all residents equally. Diaz-Trahan noted that most resident input has come from those who do live in the area.

Diaz-Trahan: All plans  have been vetted with the easement holder, The Conservation Fund
The Conservation Fund holds the conservation easement on the property. The easement limits defines the activities the town can allow on the property and what it can do with it. Diaz-Trahan presented this to the Council. She stated that she has vetted all pieces of the Master Plan with The Conservation Fund.

There are three key areas of conservation easement requirements:
  • Preserving land for outdoor recreation by or for the the education of the general public
  • Protecting a relatively natural habitat of fish, wildlife plants, and ecosystem, and 
  • Preserving open space for the scenic enjoyment of the general public 
Permitted uses of the property are:
  • Low impact recreation activities that include but are not limited to:
    Walking, hiking, jogging, cycling, birdwatching, stargazing, archaeological efforts, education programs, nature photography, picnicking, and on-leash dog walking
  • Construction of:
    Ramada’s, benches, picnic tables, water stations, bird blinds, exercise stations, ADA and non ADA trails and paths, and additional restrooms and parking areas that provide access to the area 
Remember: This is a Master Plan that will take many years to implement. The plan will be subject to review and funding by future councils as it becomes part of future annual budgets
The consultant has recommended four phases of the project. They did not define the timetable of each. Our guess is that it will be a decade before the master plan would be implemented completely. That time frame would span the terms of several Councils. No council is obligated to implement the plans of a prior council. Annually, the Council will decide if it want to do what is being suggested at that time in the Master Plan and if they want to fund it.  In essence, then, the Master Plan is guideline that may well change over time.  

Creating the Preserve is a long-term game
- - -

Wednesday, February 12, 2025

Oro Valley Town Council to Create 2025-2027 Strategic Plan

Oro Valley Town Council to discuss new strategic plan
The Oro Valley Town Council will hold a study session tomorrow to discuss projects, strategies, and guiding principles for the Strategic Plan for the upcoming two fiscal years (2025-2027). The current Strategic Plan covers this fiscal year (2024-2025) and the last fiscal year (2023-2024), meaning the Council must now develop a new plan for the next two fiscal years. The Strategic Plan is a significant document as it shapes budget priorities and guides long-term initiatives.

A current example: Trails Master Plan
Two years ago, the Council agreed to a plan that, among other things, called for "Creating a Trails Plan" focused on multi-use paths, natural surfaces, paved surfaces, access, connectivity, maintenance, mapping, promotions, and signage. [panel right] In November 2024, staff initiated a Request for Proposal (RFP) for a consultant to lead this effort. The RFP stated a budget of $50,000, an amount that should be in this year’s budget, though it has not been clearly identified.

The strategic plan is not the general plan

The General Plan is a voter-ratified document that outlines the town’s long-term vision for a 10-year period. The town is currently working on a new General Plan, OV Path Forward, which will take effect in 2026.

It is a council and staff interpretation of resident intent
The Strategic Plan, on the other hand, is a Council-approved document developed by town staff and reviewed by the Town Council. Unlike the General Plan, which is shaped by voter input, the Strategic Plan reflects a staff and council interpretation of the General Plan, setting the priorities for staff actions and activities. It matters even more than the General Plan because, unlike the broad statements in the General Plan, the Strategic Plan determines specific actions to be taken.

The translation from General Plan directives to Strategic Plan actions a open to wide interpretation
Over the years, LOVE has reported on the town’s Strategic Plans, and some residents have raised concerns about the process. These concerns include:
  • The Strategic Plan is shaped by town staff and the Council, which may lead to misalignment with residents’ priorities.
  • Staff controls the narrative, possibly selectively presenting information to the Town Council, resulting in a focus on growth that primarily benefits staff initiatives rather than community-driven needs.
  • The 2016 General Plan is still the guiding document for the Strategic Plan, since the 2026 General Plan has not yet been adopted. Some fear that the 2016 plan may be dismissed as outdated to justify new priorities that may not reflect resident approved long-term vision.
It is up to the council to get this right
Ultimately, it is up to the Town Council, not town staff, to ensure that the Strategic Plan aligns with the community’s vision. It is our hope that each of the seven Council members will challenge staff as needed to ensure that resident priorities remain at the forefront.
- - -

Tuesday, May 20, 2025

It’s Trail Time: Oro Valley’s Path Planning Enters Key Phase

Study progress continues since March update
We last reported on the Town’s 2025 Trails Master Plan Study on March 28
At that time, we reported that the Town had launched the study, identified key trail systems to be included, and begun initial outreach to gather community input. Since that time, the Town has completed a resident survey, summarized all public input to date, developed a draft vision with ten guiding principles, and held a second stakeholder meeting to collect feedback on those drafts. Tonight, Town staff will review the latest with the Planning and Zoning Commission.

Community survey results show strong support for trail maintenance and improved connectivity
The online survey received 735 responses, with 75% of respondents over age 55 and 95% being full- or part-time Oro Valley residents. Walking, road biking, and hiking were the most common uses. Across all trail types, the top priorities were regular maintenance, better connectivity to destinations, and improved signage and maps. Common barriers included a lack of ADA accessibility, limited parking, and unclear wayfinding. Respondents also emphasized the importance of trails close to home and connections to parks, schools, and shopping.

Parking, signage, and ADA access top list of trails barriers
The survey and other outreach efforts revealed several consistent barriers across Oro Valley’s trail and path systems. Many users cited inadequate parking, poor signage, and limited access to maps as obstacles. Lack of ADA accessibility was a concern, especially for unpaved trails. Users also noted safety concerns, discomfort due to limited shade or rest areas, and difficulty connecting to desired destinations. These issues were common across all four focus areas: unpaved trails, paved multi-use paths, the Loop, and the Vistoso Trails Nature Preserve. 

Stakeholders ask for restrooms, Wi-Fi, and more shade
At the May 8 stakeholder meeting, participants discussed the draft vision and guiding principles and offered additional feedback. Several comments focused on the need for basic amenities—such as restrooms, water fountains, and shaded seating—especially at high-use trailheads. Others emphasized the importance of reliable Wi-Fi access at locations like Vistoso Trails to support downloadable maps. Parking access for those who don’t live near trailheads was a recurring concern. Attendees also raised issues about maintenance practices, enforcement of trail rules, and the need for safe, accessible paths for all users. One organization, the Sonoran Desert Mountain Bicyclists, expressed interest in partnering with the Town or Pima County to fund and install bike repair stations at trailheads. 

Ten guiding principles will shape future decision
Based on community feedback, the Town has developed a draft vision that emphasizes a safe, well-maintained, and interconnected trail system that supports recreation, wellbeing, and a connection to nature. Supporting this vision are ten guiding principles organized under four themes: reinvesting in existing assets, enhancing community connectivity, growing a safe and accessible network, and improving signage and wayfinding. For example, one principle calls for adding restrooms, benches, and shade at heavily used trailheads. Another recommends providing downloadable digital maps and adding trail signage to help users navigate the system more easily. These principles will guide future decisions on trail amenities, maintenance, accessibility, and expansion. 

Draft plan will include implementation steps, costs, and funding strategies... none of which have been discussed to date
At tonight’s meeting, the Town will also review the draft outline for the full Trails Master Plan. The outline includes dedicated chapters for each of Oro Valley’s four trail systems—unpaved trails, paved multi-use paths, the Loop, and the Vistoso Trails Nature Preserve. Each chapter will address existing conditions, proposed improvements, maintenance standards, signage, safety, accessibility, and future connections. The final plan will also include implementation steps, funding strategies, and a process for ongoing updates and public engagement. The final plan could reasonably be expected later in 2025
- - -

Wednesday, May 6, 2026

What Council's Approval Of The Trails Connect Study Means To You

Eighteen months in the making
On April 22, the Town Council voted 7–0 to adopt the OV Trails Connect Trails and Paths Master Plan, completing a year and a half planning effort. The plan reflects input from residents, trail users, and stakeholder groups gathered through surveys, trailside meetings, and workshops. The Council’s action adopts the plan as a guide for trails improvement and development for the next ten years. Funding will be considered over time as part of the town's annual budget process. (See LOVE previous reports)

Focuses on improving what residents already use
The plan covers a system that includes more than 100 miles of paved and unpaved routes. It focuses on maintaining these trails, not on building new ones. For example, it addresses pavement issues on multi use paths along roads like Tangerine, La Cañada, and Naranja, improves safety at crossings, and fixes problem areas such as erosion, washouts, and blind corners on both paved and unpaved routes. It also introduces better ways for users to report issues so they can be tracked and resolved more consistently.

Closes gaps and extending key routes
The plan identifies several connectivity improvements. These include extending multi use paths along major corridors, most notably a continuous path along Rancho Vistoso Boulevard, and working with regional partners on a new northern extension of The Loop. The previous route was found not viable, so a new alignment will need to be determined. The goal is to make it easier to travel across Town by bike or on foot without using streets.

Changes include Vistoso Trails Nature Preserve

At the Vistoso Trails Nature Preserve, the plan calls for improving the existing paved path system, increasing access for users of all abilities, and adding clearer wayfinding and etiquette signage. These are the types of changes that would affect how residents move through and use one of the Town’s most heavily used trail areas.

Recognizes and manages well used dirt trails
The plan specifically addresses unpaved trails in areas such as Big Wash, Honey Bee Canyon, and Panorama Trails. Many of these routes have been used for years but are not formally designated. The plan proposes formally recognizing these routes, improving access, and adding signage to define trailheads and connections, while coordinating with State Land and regional partners where they extend beyond Town boundaries.

Creates better signage and navigation throughout town
Residents will see more consistent signage across the system, including directional signs, trailhead markers, and maps. The plan also calls for digital maps and tools that allow users to locate routes, understand connections, and even report maintenance issues. These changes are intended to make the entire system easier to use, especially for new or occasional users.

Watch for changes over time
The impact of this plan depends on what the Council funds each year. Early changes are likely to be smaller, such as improved signage, better trail access, and maintenance of existing paths. Larger projects, like extending multi use paths or adding connections to The Loop, will take more time and coordination with other agencies. Many improvements, especially on unpaved trails, will depend on partnerships and volunteer support. Over time, the plan provides a way to make steady improvements, with each year’s budget determining what residents see next.
- - -

Monday, November 23, 2020

Town Council Directs Staff To Better Reflect Towns Needs In Parks and Recreation Master Plan

Plan must reflect resident needs
Last Wednesday, The Oro Valley Town Council directed town staff to better reflect resident needs in the Parks and Recreation Conceptual Master plan. That plan is being developed by PROS Consulting.  Council noted that the conceptual plan  does not properly match the priorities of the community. 

The town developed these priorities after five months of community input gathering by PROS Consulting. They gathered information from community meetings, an input survey and a statistically valid online survey. 

High Priority "Trails and Conservation Areas" ignored in plan
Council Members Barrett and Bohen observed that the conceptual plan relied too heavily on comparisons of what Oro Valley has to overall national statistics; and that it did not adequately reflect what residents said they want. In particular, high priority items, such as trails and open space were generally ignored while low priority items such as basketball courts were emphasized.


Even more astounding is that the conceptual plan has no facilities for the town north of Tangerine. Yet, 40% of Oro Valley residents live in there. 

Winfield : The plan must emphasize resident defined top priority items 
Speaking at length, Mayor Winfield expressed disappointment that the community needs were not reflected in the conceptual plan. Referencing the needs assessment: “With that community input we are going to pivot. It’s going to be included. I am confident of that. I agree. The rankings are critical foundational information to the development of the master plan.” Community input "...simply can not be ignored…. We are going to give greater emphasis to those three priority items.” 

Winfield: North of Tangerine needs a community park
Speaking specifically to the residents north of Tangerine, Winfield observed that PROS equity mapping of facilities has clearly shown the need for a community park north of Tangerine… a park of 10 to 75 acres.  "I believe that the master plan should reflect that need.” 

Winfield's approach to Oro Valley Parks Planning is resident, not commerce focussed
Winfield’s comments are one of those times that clearly differentiate the Winfield Council from the Hiremath Council. 

Hiremath’s goal was to use Parks and Recreation facilities for sports tourism and to focus on building facilities for younger families. The emphasis on attracting younger families was part of his failed “rooftops strategy.” 

Winfield, on the other hand, is focussed on the needs of those who live in the community now and who will likely want to live here in the future. A multi use trail will not bring thousands of people into Oro Valley to spend their money; but it will bring happiness to those who live here.
---

Wednesday, October 12, 2022

Eleven Reasons For The Parks and Recreation Bond Project Spending Disaster

A disaster of their own making
We have identified eleven reasons why the spending for the park bond amenities got so far "out of wack" from reality. Most certainly, planning to spend $53 million when there is only $33 million available to spend is a disaster.

1.  Naranja Park costs a lot more to build than "guestimated"
As we detailed in our article Monday, the key spending problem is the anticipated cost of Naranja Park. That cost has doubled from what was "guestimated" in the Parks and Recreation Master Plan. It was that number, $17million, that the Council relied upon when the bonds were issued a year ago.

2.  No Naranja Park design in place to start
The Oro Valley Town Council agreed to move forward with the Naranja Park extension at a time when  there was no agreed upon design of what it was going to be. As a result, Council had no engineered cost estimate of what it would cost to build "it'. 

3.  Council ignored experienced advice
The Council ignored the advice of the only person on Council who has ever built anything of any significant magnitude. Council Member Solomon told them that they were going about this the wrong way. First, you design. Then you raise the funds. The Council voted to do the process backwards.

4. Cheap borrowing cost came at a price... Pressure to spend and build now!... "Haste Makes Waste"
Council Member Nicolson championed the concept that the town must borrow now because interest rates were cheap. He was right. Rates are higher today than they were in May, 2021. 

The price of borrowing was a commitment that 85% of the funds had to be spent within three years of the bond issuance. That is $21.25 million. That requirement put a "gun to the Council" to spend the money quickly.  It also meant that the town had to adopt a "construction manager is a risk" approach. This is a more costly process than the traditional building process. 

5. Inflation...shortages.. contingencies... design
According to Paul Keesler, Town of Oro Valley Director of Public Works, three items have worked together to increase cost 65%. [See panel right] The biggest culprit is an inflationary 30-40% increase in construction material cost. Timing has also hampered getting materials.

6. Naranja Park amenity scope creep
The scope of what is planned to be built has changed. The pump track is now an "all wheel space". The splash-pad is larger in size and includes shade sails, a ramada, and a bathroom. The cost of grading the land to which the dog park is being relocated is more than $1million.

7. Huge Naranja Park infrastructure cost of $11million
It is going to cost almost $11million to level the land and put in the utilities for the park. Certainly, someone should have known this when the original $17million total cost of the park was included as part of the Parks and Recreation Master Plan. Simply put: The cost of getting the land ready for the amenities was vastly more than guessed by the study's consultant.

8. Council never adopted the Parks and Recreation Master Plan
The Council decided not to approve the Parks and Recreation Master Plan. This is a 10 year plan. The plan was developed by a consulting firm. There was ample resident input. This plan included a statistically valid set of resident wants. Instead of approving the plan, the Council voted unanimously (Solomon absent) to instruct town staff to use it as a guide for future planning.  Thus, there was no plan in place and Council was free to do as it wished. Which it did!

9.  Pet Projects
It is not possible to piece together a coherent, financially sound plan based on the wants of Council members, each of whom have their own pet projects. The splash pad, golf course irrigation replacement, and the "pump track" are examples of special projects that one Council member wanted that really were not the priorities of the community. Trails, on the other hand, are a major stated desire of the residents as shown in the Master Plan Survey. Trail development, however, has taken a "back seat" to all these other projects.

10.  No early warning of outrageous cost
Keesler asserted at the Council meeting that the first time he had a glimpse of what it would cost to "do" Naranja Park was on September 23. That's when all the designs were (sort of) "complete." But, the cost of doing the grading was known some time earlier because it was an ongoing activity for many months and contracts have been in place.  Former Town Manager Jacobs should have reported to Council that site preparation was going to be far more than the consultant "guestimated". 

11.  Locking in the use of the half of the half-percent sales tax for non golf purposes
The Council voted to apply one half of the half-percent community center/golf sales tax to non golf purposes. The noble goal was to let the 99% of the community who never use those facilities get some benefit from the tax. The town pledged this tax to pay back the Park Bonds. That's a 20 year commitment that can not be changed. 

So...what can be done
It is now up to the Council do something.  They only need to build what they are legally required to do in the bond indenture: Spend 85% of the funds in the manner as noted in the bond indenture and continue to pledge the quarter percent sales tax to repay the bonds. Otherwise, they can do as they wish regarding what to build and when to build it.

Some of the amenity building on Naranja Park can be deferred to future years' spending.  As a minimum, the current plan for relocating the dog park... building pristine roads... adding all four new fields can wait.  The Council can defer building the trails but that would  punish residents who actually want to walk or bike to our parks without getting hit by a car on Oracle Road.

Tough Council decisions, decisions of their own making.

They need to fix the problem.

Whatever they decide, the vote needs to be unanimous. No more blaming each other. Partisanship has to go.
- - -


Thursday, May 28, 2020

Oro Valley's Parks and Recreation Random Survey Missed The Mark

Last week, The Oro Valley Town Council held a special session to review to Phase 1 Parks and Recreation Master Plan study. This session was dedicated to understanding and asking questions regarding the study we reported last week. This study focussed on what residents say they want.

Mike Svetz, project leader for Pros Consulting, the firm retained to do this study, emphasized that the goal is to develop master plan that is “realistic, implementable and financially sustainable. Anything that you build has life cycles to them… need to insure that you have the operating and maintenance dollars to maintain and replace things as they age. The plan needs to consider both the short term investment and the ongoing cost.

Svetz observed that the town should develop a plan  that meets the needs of all residents, not simply the needs of one dominant population segment. In Oro Valley, that would be senior and retirees.

Svetz: People don't know what we have
The study of wants highlighted paths and walking trails as a must investment. Svetz stated that these were not new trails, but the upkeep of exiting trials plus the creation of some loop trails in park areas. Council Person Solomon observed the the town has 54 trail miles. He wondered if residents knew that. Svetz stated that they did not know but he had not basis for this statement. The study did not "test" people on their knowledge of what Oro Valley has. It asked only what they wanted.

The devil is in the detail and the detail is missing
Responses specific to location
Council Person Barrett wants more detail of information by area of the town. For example, the stated need that town needs more restroom facilities most certainly does not apply to the town's parks. Each has restrooms. However, the many HOA parks don't. Those would be the responsibility of the HOA and not the town. Thus, the need for more restrooms is not a town challenge.
The bathroom puzzle
While the study is able to segment results by age group it is not able to do it by geographic location. According to Svetz, the statistically valid survey, a survey of xxx people, was geographically representative of the town's population locations, but Pros Consulting never associated a response with the geography. Thus, the study does not tell what people in, say Rancho Vistoso want versus what people in the original section of Oro Valley want. This seems like a very significant oversight on the part of the town and study designers. Barrett wants that information so the "the town can invest strategically."
What kids want
Mayor Winfield observed that detail is needed regarding what Oro Valley's kids want. The survey did not include them, It included their parents who, according to Svetz, were supposed to respond to questions with the whole family in mind.  This really is not a valid gauge even though Svetz plans to provide responses based on family demographics. Given the methodology, we now understand why Baskeball Courts (Oro Valley has one) or new fields, items that were important in the last survey of 2014, suddenly dropped to low priority. Youth baseball and little league, a big concern a few years ago, fell of the chart. Other then refurbishing four of the five fields at Kreigh Park, nothing has been done. Pickleball Courts, on the other hand, jumped from the bottom in 2014 to near top. This, after the town has added pickleball facilities.

Town on its own?
The town plans to reduce the use of an external consultant in completing the master plan, spending no more than $30,000. According to Oro Valley Parks and Recreation Director Krisy Diaz-Trahan, "We have a meeting with Mr. Svetz scheduled to determine where the greatest talent pool exists" to do each one of the remaining steps to complete the master plan.

Wednesday, March 24, 2021

No Bonding (Likely) For Parks Master Plan

Bonding Highly Unlikely In Funding Parks and Recreation Plan
Seeking public approval for issuing bonds with a property tax to repay them is a highly unlikely source to pay for the Parks and Recreation Master plan. Mayor Winfield noted, at last week's council study session, that residents have continually voted down such bond measures over the years. 

Winfield noted that the survey the town conducted last year asked what people would want assuming there would be no new taxes to pay for such. "This means that it would not cost them anything." 

Town staff acknowledged this. In fact, it appears that staff never considered bonding to be a viable funding source. "Our community doesn't really have an appetite for a bond initiative" to fund parks, according the Parks Director Kristy Diaz-Trahan. "We do know that there are financing options available that can be used." She noted that funding for parks is on a "pay as you go" basis. That's how we moved the needle somewhat at Naranja Park over the last seven or eight years." Indeed, it is becoming quite a park as we noted in our posting: "Naranja Park... Building Over Time... Meeting Resident Needs."

Funding from various sources
According to Winfield and others speaking at the study session, some of the funding can come from sources other than from the town. For example, funds from the Regional Transportation Authority (RTA) may be available to pay for trails funding. In fact, Winfield and Vice Mayor Barrett recommended to staff that they move trail spending timing up to take advantage of these funds.

According to Consultant Mike Svetz of Pros Consulting, the half cent sales tax the town enacted to subsidize municipal golf can be used for work at the community center. This includes paying for improved parking and repaving tennis courts. 

Also, council believes that there  may be opportunities to partner with third parties, like Pima County and the Amphi School District.

Three facilities are 65% of the $62 million plan
The Plan calls for $62 million in spending in the next ten years. Projects are classified in groups (see panel above, right).  The cost is driven by three items: $17 million to build out Naranja Park; $13 million for the Community Center; and $10 million for trails. Indeed, spending to repurpose the "clubhouse" as a community center begged the question, asked by Council Member Bohen, as to whether the town had considered starting from scratch, building something new. Diaz-Trahan said they had not.

Winfield: Target Town Spending $25 million in capital spending over 10 years
The challenge will be to prioritize spending. Hopefully, this will be done based on the statistically valid survey that formed the baseline for the study. Winfield set a target for which the town would be responsible of $25 million in capital spending over ten years.

In addition, as Mayor Winfield noted, priorities must also consider the ongoing maintenance cost of the facilities. For example, trails can be maintained at minimal cost whereas park equipment requires relatively more cost. Also, as Svetz noted at the meeting, there are opportunities to break projects, such as the Naranja Park buildout, into phases.

Initial priorities presented to Parks and Recreation Commission last night
Last night, the Oro Valley Parks and Recreation Commission met to discuss project priorities and funding the the plan.  Svetz presented project priorities and funding sources. His plan targeted the $25million Winfield capital spending cap by dropping spending on Naranja Park and the Community Center visionary, rebuilding projects. 

Next Step: Community Meeting on March 30
Staff will host a community meeting on March 30.  This meeting also will focus on the Parks and Recreation Master Plan Capital Improvement Project (CIP) priorities and funding expectations.
---

Wednesday, November 18, 2020

Town Has No Legal Authority To Plan Future of Vistoso Golf Course

No legal authority to plan Vistoso Course use
Last week's community outreach on the conceptual master plan of Oro Valley's Parks opened with a "bang". With many Rancho Vistoso residents tuned in, Oro Valley Parks and Recreation Director Kristy Diaz-Trahan tried to diffuse the "Vistoso Golf" time bomb.  (Time stamp 0:03:18).

Diaz-Trahan stated that the town is not in a legal position to opine on the future of the former Vistoso Golf Course property: "The town does not have the legal authority to add someone else's private property within this master."  This is because the hoped for transaction between The Conservation Fund and Romspen LLC, the property owner, has not occurred. That transaction would have resulted in the eventual transfer of the land to the town.

Town still focused on property
This does not mean that the town has no interest in the situation. In fact, our town leaders are very much up-to-date on the situation and under some pressure to do something. They commissioned a study on what it would cost for the town to maintain the land as preserve. We will discuss this in an upcoming article. Last week, they held yet another closed-door executive session to discuss the future of this land.

Diaz-Trahan noted: "...please know, the town has heard the [Rancho Vistoso] community and that we have a commitment that in this final master plan those desires [of the Rancho Vistoso community] will be addressed." That desire is for the 208 acres of Vistoso Golf become a preserve for all to use in the community.

Wants of 40% of residents ignored
Not all agree with Diaz-Trahan.  Speaking at the outreach      meeting (remarks at right), Oro Valley resident Michael Bilodeau pointed out that the assessment did not accurately reflect the needs assessment created last spring. Bilodeau is an advocate of the need for community engagement in the master plan development. He discussed this in a LOVE guest view in March.

At last week's meeting, Bilodeau observed that the assessment as presented does not meet the goals of the study, which is to develop future parks and recreation needs that has an equitable distribution of facilities. As LOVE observed previously, the Parks and Recreation conceptual plan at this point places little town focus on the needs of Rancho Vistoso. 

Bilodeau expressed surprise that some previously town identified low priority items, like a BMX park and more basketball courts, were included in the conceptual plan; while, with two exceptions, trails and related items were not considered. 
"I still don't get the fact that we go from an assessment of the needs of the community, pretty much ignore them all, and we jump directly into a conceptual plan that includes a lot of low priority needs."
He also pointed out that 40% of the town's population lives north of Tangerine where there is only one town facility and not very many amenities. He alleges that the proposed 'fix' that this conceptual plan makes is "...to make no investment north of Tangerine."

A gut punch: "The plan does not address the needs of Rancho Vistoso residents"
Other concerns voiced by attendees include:
  • Rancho Vistoso residents are not considered to be part of Oro Valley yet they pay taxes twice: Once to the form of HOA fees; and the other in the form of sales taxes (and utility taxes)
  • 50% of Oro Valley's residents are seniors. "We don't need more archery parks."
  • "Look at what people want. Not what you think they should have."
  • The aquatic center and the community centers are not free to residents even though the town paid for and subsidizes them.
  • Residents of Vistoso want open space and this conceptual plan does not address this.
  • Why are there not parks planned for north of Tangerine Road?
  • Why would Romspen turn down a good offer? Why can't the town send a signal to Romspen that the council will not rezone this land?
The plan is conceptual at this point. Much more work needs to be done. Patience on the part of all is needed.
---

Tuesday, April 1, 2025

Vistoso Trails Nature Preserve Concerns Dominates First Trails Connect Study Meeting

Vistoso Trails Nature Preserve: Front and Center
Discussion of the Vistoso Trails Nature Preserve dominated the first meeting of Oro Valley’s Trails Stakeholder Group. More than a dozen residents and trail users joined the virtual March 12 meeting to kick off the public input phase of the Town’s Trails Connect study.

Strong resident focus on that one trail area
Out of the 74 minutes of trail-related discussion, roughly two-thirds of the time (about 50 to 55 minutes) focused specifically on the Vistoso Trails Nature Preserve. Residents praised the trail’s accessibility, safety, and value to nearby neighborhoods. At the same time, concerns were raised about access points, signage, and trail etiquette. One participant noted that informal entry routes pose safety risks and contribute to off-leash dog issues. Others brought up long-term needs such as trailhead parking, revegetation, and how future maintenance and improvements would be funded.

Oro Valley's other trails were only briefly discussed

Participants also acknowledged other key trail areas in Oro Valley. These included the Loop, Honeybee Canyon, Big Wash, and Panorama Park. Attendees praised the Loop for its accessibility and connectivity, while Honeybee Canyon was recognized for its scenic desert trails that attract regional users. Big Wash was noted for the quality of its trailhead and paths, and Panorama Park was highlighted as a natural area with exceptional views.

Town planner Vella encourages a town-wide focus
Town Planning Manager Bayer Vella worked to ensure the discussion reflected the full scope of the Trails Connect study. He began the meeting by explaining that the plan includes both unpaved trails and paved multi-use paths throughout the town. He pointed to examples like the Loop, Big Wash, and future connections to regional areas such as Catalina State Park and Pinal County. When the discussion returned often to Vistoso, Vella acknowledged those concerns but reminded participants that the plan’s purpose is to develop a comprehensive trail network that benefits all users. “My hope is that everyone in this meeting can view this as all boats rise,” he said, “not a competition in terms of funding and who gets what.”

What’s next...You need to be involved
There is no doubt that Vistoso Trails Nature Preserve is a very important town recreational asset. There's no doubt that it needs to actually be created. Still. The next meeting ought to have a broader focus. That meeting is scheduled for April 23. At that time, the group will focus on reviewing initial findings from surveys and stakeholder input, and begin shaping draft goals for the Trails Master Plan. It would be good to get broader participation from residents who use trails across different parts of Oro Valley. Interested in joining or learning more? Visit www.OVTrailsConnect.com.
- - -
Want to know more? Read our previous article on the study.

Thursday, April 10, 2025

Help Shape Oro Valley’s Future—Land Use, Parks, Trails, and More

There’s still time to help set goals for OV’s future!
Residents will continue building the goals, policies and actions that will guide OV’s future throughout April and the beginning of May. Don’t miss out on this unique, resident-driven opportunity to shape OV’s future.

Ov’s land use map guides development in the future!
The 10-year plan’s land use map depicts the community’s development and growth expectations. This month, residents can help review and discuss any potential changes to the Town’s land use map. Join residents and Town staff in Council Chambers from 5:30 - 7:30 PM on:

Monday, April 14 – Discuss the “big picture” elements of the land use map
Thursday, April 15 – Discuss land use designations for individual, vacant properties.

Did you know the state requires the plan include a process to amend it? The plan is expected to evolve over the next 10 years to stay relevant. Residents will also discuss the process to amend the plan during the Monday, April 14 meeting.

Plan for parks, recreation, trails and water conservation
In addition to development, residents will also help craft goals, policies and actions for the Town to implement over the next 10 years for parks, recreation, trails and water conservation. Online meetings will be held from 5:30 – 7:30 PM on the following dates:

April 10 – Additional guidance for parks, recreation and trails
April 24 – Draft goals, policies and actions for parks, recreation and trails
May 1 – Additional guidance for water resources and conservation
May 13 – Draft goals, policies and actions for water resources and conservation

Visit OVPathForward.com to get involved today!

For residents interested in unpaved trails and multi-use paths, please join the focused online meeting on April 23. This meeting will help develop a separate yet related Trails Master Plan. Visit OVTrailsConnect.com for more information.

All resident voices are needed to make sure both plans represent the community!

Thursday, May 22, 2025

Bits and Pieces

Traffic delays expected on Ina at Westward Look today
Drivers should expect traffic delays today at the intersection of Ina Road and Westward Look Drive due to traffic signal repairs. Westbound Ina will be reduced to one lane with a 25 MPH speed limit, and periodic full stops will occur during crane operations. Oro Valley Police will direct traffic while the signal is offline. Motorists are encouraged to use alternate routes and allow extra travel time.

Nine Month Results: Town finances remain stable with a caution
Town staff reported at Tuesday's Budget and Finance Commission meeting that Oro Valley’s financial position remains strong through the first nine months of the fiscal year. Revenues—including sales tax and recreation income—are generally meeting or exceeding budget, while most departments continue to manage expenses at or below expected levels. Staff credited conservative budgeting and a healthy local economy for these results, but cautioned that slower revenue growth may be ahead, reinforcing the need for continued prudent financial management.

Nine Month results: Community Center Fund surplus grows as golf revenues exceed budget
Tuesday, The Parks and Recreation Advisory Board received an update on the nine-month financial results for the Community Center Fund and municipal golf. Staff reported that both areas are performing well above expectations. Membership and program revenues are exceeding budget, golf rounds and revenues remain strong, and overall expenditures are on track or below budget. As a result, the Community Center Fund is now projected to end the year with a significant surplus, growing the fund balance to an estimated $2.3 million.

Staff sees progress toward golf self-sufficiency...possibly freeing funds for other recreation activities one day
Also at this meeting, staff reported that municipal golf operations are now generating an operating profit, thanks in part to strong membership growth and efficient management. Since the town took ownership ten years ago, about $29 million in half-cent sales tax has been collected to subsidize golf and the community center, with cumulative operating losses and major capital investments totaling about $19 million ($10 million each for losses and capital). Now, things may be changing. Staff noted that the next step is to use these operating surpluses to fund ongoing capital improvements, reducing the need to rely on the half-percent sales tax for golf’s capital needs. As golf operations move closer to full self-sufficiency, staff emphasized that more sales tax revenue will be available to support other parks and recreation projects across Oro Valley.

Honor America's Heroes Monday
Memorial Day is more than just a day off—it’s a time to remember and honor those who gave their lives in service to our country. Join the community on Monday from 10 a.m. to noon at the Arizona Heroes Memorial in Naranja Park for a special remembrance event. The ceremony is free and open to all.

OVPOA: Delay in police MOU discussion a good thing
According to Chris Knapp, representative for the OVPOA and FPO (Fraternal Order of Police), removing discussion of the possible wage agreement between the town and OVPOA from last night's council agenda is a good thing.  Knapp noted that there have been discussions with council members and staff and that good progress has been made. Knapp thinks a compromise is at hand.  A new MOU will be presented for approval at the June 4 council meeting.

Vella provides added insights into the Trails Master Plan
On Tuesday, LOVE provided an update on the Town’s Trails Master Plan study. That evening, Town Planning Manager Bayer Vella offered additional insights during a presentation to the Parks and Recreation Advisory Board, expanding on several key areas:

  • Funding may be key: Vella noted that Marana dedicates part of its bed tax to trail and open space improvements. Oro Valley may consider a similar approach to fund future trail needs.
  • Trail easements required: Much of the well-used trail land north of Big Wash lies on State Trust Land with no public easements. Gaining access will likely require coordination with state and county agencies and possibly purchasing easements.
  • Trail difficulty ratings suggested: Board members proposed labeling trails by difficulty, similar to ski runs. Vella confirmed that trail maps will include slope, surface type, and other features to help users—especially families and those with mobility concerns—plan their outings.
  • Connectivity gaps identified: Suggestions included creating safer access from the Loop to Catalina State Park, and building a direct connection from Riverfront Park to the Loop—both of which will likely be included in the plan’s recommended actions.
  • Volunteer and partner contributions remain vital: The Town has no full-time trail planning staff. Many unpaved trails have been built by developers or volunteers, and that approach will remain important as the system expands.
- - -

Monday, February 1, 2021

Parks and Rec Draft Master Plan "Connects" Oro Valley

Recommendations link individual trails and trail segments
The Town of Oro Valley is unveiling it 2020 Parks and Recreation draft master plan in a study session before town council this Wednesday. The study is the result of a year long effort at the direction of the Oro Valley Town Council. 

Last week, LOVE summarized the draft master plan facilities conceptual plans. Today, we discuss the “Connectivity Analysis” of the town’s natural and multi-use paved trail system ("Trail System"). 

The town’s trail system is the highest parks and recreation priority
..as identified by Pros Consulting, the firm the town retained to create the master plan. They based their conclusion on community input that includes a random phone survey, community zoom meetings, and written public comment. 

There are fifteen recommendations
Pros has identified missing path trail segments; and opportunities to expand the existing trail system. These are shown as “A through O” on the panel at right. We’re highlighting five. You can read about the others and review the draft master plan here.


Five recommendations make a huge difference
Extend the CDO shared use path into Rancho Vistoso (Item D)
This has to be a relatively inexpensive yet very important step. There is about a half mile of paved path that connects the CDO Linear Park Shared Use Trail  to Big Wash. The trail runs on the east side of the wash. The paved portion runs west of the Oro Valley Hospital. The pavement ends a bit north of the hospital. 

There is about a half mile of unpaved path along the wash that extends from that. It connects to Rancho Vistoso Blvd, west of Vistoso Commerce Loop. 

When this small section is paved, Rancho Vistoso residents will be able to ride a bike to or walk to the Oro Valley Marketplace, Catalina State Park, Steam Pump Ranch, and the Rooney Ranch Shopping Center. If they are really ambitious, they can go all the way to the Tucson Mall and to the east side of Tucson if they want. They will be able to do this without ever being on a road way. 

The estimated cost of completing this trail is $750,000. This will be funded by Pima County.

Pedestrian bridge across the CDO wash (Item J)
This bridge will connect Riverfront Park to the CDO Linear Park Shared Use Trail.  
Currently, the only way to get from the shared use trail to Riverfront Park is to walk or ride along Lambert Lane and on a section of Oracle Road. 

The plan is for a path from the south side of the park to a bridge that crosses the CDO. If you were to walk this now, you would have to walk through the wash, which is not a simple task; and then scale a 10 foot wall to get to the path. Obviously, few had done this. The bridge opens easy access for those who want to park at Riverfront and walk or ride the CDO Linear Park Shared Use Trial. The estimated cost of this bridge is $1 million. However, funds may be available from the county to pay for it.

New shared use path connecting Kreigh Park to the Linda Vista Trailhead (Item L)
The best and really only way to safely access the Linda Vista Trailhead is by car. Otherwise you encounter the perils of walking or riding along Oracle Road. Sucking exhaust from cars on Oracle Road is not a fun thing! This new path would remove the problem providing easy access for all.  The estimated cost of this is $300,000.

New shared use path connecting CDO Linear Park Shared Use Trail to Kreigh Park (Item K)
This path would use existing roadways to connect the CDO Linear Park Shared Use Trail to Kreigh Park. It would access the path on the bridge next to the Oro Valley Country Club, connecting to existing roadways that lead to the park. These are quiet residential roads. The estimated cost is $1 million.

Convert the sidewalk on one side of Rancho Vistoso Blvd to a shared use path (Item A)
Currently, there are narrow sidewalks on either side of Rancho Vistoso Blvd. This item would widen one of these to be a path that would provide safe connection to Honey Bee Canyon Park, Honey Bee Preserve and schools. It will also link to the former Vistoso Golf Course. The estimated cost is $1.8 million.

Total Cost: $10 million
The total cost of the 15 items is approximately $10 million. Some of the funds for this would come from the county or grants.
---

Wednesday, April 16, 2025

Pond Or No Pond? Council To Consider Plan For Focal Vistoso Trails Nature Preserve Area Tonight

The numbers are in
Last December, the Oro Valley Town Council voted to explore the idea of restoring a water feature at the Vistoso Trails Nature Preserve. Initially, the Council had favored creating a desert garden—no pond—based on an early estimated cost of $321,000. However, the design of that desert garden ballooned to $2.1 million per the 2024 Master Plan presented to council last September. That made the idea of including a pond more realistic. Council asked staff to investigate further, and extended the contract of consultant Rebecca Field of Kimley-Horn to create a concept to include a pone. Field will present her findings to Council tonight.

(Fully loaded) Water feature restoration cost is $1.7 to $1.9 million
Field will present two pond options—one covering the full 2.5-acre footprint of the original pond, and another scaled down to 1 acre [see panel right]. The cost to restore just the pond—liner, pumps, edge treatment, and other equipment—comes to about $1.2 million for the larger pond and $1.1 million for the smaller one. Once project administration and overhead are added (construction management, design documents, permits, profit, and contingency), the pond-related costs rise to about $1.9 million for the larger pond and $1.7 million for the smaller one.

click to enlarge
The cost of the rest of the site (the “desert garden” improvements) is $1.8 to $2.0 million
 
In both alternatives, the rest of the site adds $1.8 to $2.0 million to the project cost. This includes walking trails, ramadas, benches, landscaping, irrigation, turf, parking, and other amenities throughout the preserve. 

Though the size of the desert garden area differs, the features and construction elements included in each design are nearly the same. That’s why the total costs are close, even though one garden covers three times more space than the other.

Total project cost: About $3.7 million
The total cost for either option—large pond or small pond—is approximately $3.7 million. That figure includes both the pond and the full site restoration. Consultant Field has noted that these are early, conceptual cost estimates based on preliminary designs and market assumptions. They are not developed by a professional cost estimator and don’t account for inflation or future price changes.

Possible federal reimbursement lowers cost to $2.9 million
Part of the project may be eligible for federal reimbursement under the Land and Water Conservation Fund. Recreational projects like this one can receive up to 50% in matching funds. If that funding is approved, the Town could recover as much as $800,000, lowering the net cost to around $2.9 million.

Estimated annual cost: Smaller pond saves $72,000 a year
The 2.5-acre pond would cost about $135,000 per year to operate, due to higher water and maintenance costs. The 1-acre pond would cost around $63,000 annually. That’s a difference of $72,000 each year, making the smaller pond the more affordable long-term option.   

click to enlarge
This is a very different garden design than was presented last September
A 2.2-acre “Desert Garden Area” was included in the September 2024 Vistoso Trails Nature Preserve master plan.  The plan was to eliminate the pond entirely and turn a small area into a landscaped garden. That garden [Panel left] looks to be much smaller than the former pond area. 

A long wait for a final decision
It has been more than three years since the Town received the Vistoso Trails property. Several plans have come and gone, and the preserve remains largely untouched. Tonight’s meeting is another chance for Council to make a decision. Whether that happens—or whether this leads to another round of studies and delays—remains to be seen.
- - -