You Decide: Did Mayor HIremath Act Improperly?

---
Last week, the Oro Valley Town Council considered and approved a conceptual design for El Corredor. This is a project is located on the northeast corner of Linda Vista and Oracle Road.   The council voted to approve the plan.

The developer and owner of the property is Ross Rulney.

We have pieced together the following facts:
  • On December 7, 2011 the Council voted to approve a general plan amendment rezoning the Rulney property to commercial and multi-family housing. There were two people who voted against this amendment. They were Council Member Bill Garner and Mayor Satish Hiremath
  • On January 30, 2012, two months later and almost two years after the Mayor was elected, Ross Rulney, the developer of E Corredor, contributed $410 to Mayor Hiremath's PAC, according the the Mayor's filed report.  Rulney or his company had not previously contributed to the Mayor's campaign.
  • At the May 16, 2012 Town Council Meeting, there was an agenda item to approve the Ross Rulney (El Corredor) PAD Ordinance 12-07.  Mayor Hiremath voted to approve the PAD.
  • Last week, Mayor Hiremath insured that the El Corredor conceptual plan was voted upon, even though the council appeared to want to continue the item to discuss a "friendly" amendment. 
John Musolf discussed the concept of an "appearance of conflict" during the call to audience portion of  last week's meeting.
---
The questions we pose are: Did Mayor Hiremath act improperly to even accept a donation from Rulney barely a month after he voted against a general plan amendment for the Rulney project? Did Rulney's try to buy influence?  Did the Mayor have an epiphany?

We don't know. We will never know.

As a minimum, we assert that Mayor should have recused himself from voting on anything to do with this project after he received this strangely timed contribution.  He was, after all, voting on matters directly related to a very strange, years after the election political contribution.

What do you think?
---

Monday, July 25, 2016

Guest View-Diane Peters: Who's Really To Blame For Oro Valley's High Density Developments?

Many Oro Valley residents have stated their displeasure with all the high density developments that have been approved since Mayor Hiremath and Councilmembers Hornat, Snider, and Waters took office in 2010. The three new apartment complexes on Oracle Road have been most frequently cited.

In response, someone, has attempted to take the onus off the Majority-4 by claiming, in a published letter entitled "Laughable Presentation,that all three apartment complexes on Oracle Road were approved by a unanimous vote. The writer specifically named Councilmembers Burns, Garner, and Zinkin as partaking in those unanimous votes.

The writer was wrong.
  • All votes were not unanimous. 
  • Zinkin and Burns were not on council when these approvals occured. 
  • Garner voted against two of the three complexes.
These are the FACTS as stated in the public record:

Encantada at Steam Pump ~ 270 apartments:
This rezoning was approved in April 2011. Mike Zinkin and Brendan Burns were not on council. They took office on June 6, 2012, so how could they have voted to approve a rezoning that took place in 2011? The Conceptual and Architecture Plans for this project were approved in May 2012, but it would still be another month before Burns and Zinkin would take office.

El Corredor at Oracle and Linda Vista ~220 apartments:
This one required a Major General Plan Amendment to convert 13 acres to high density residential. That vote took place in December 2011. Zinkin and Burns were not on council and Bill Garner voted against it. When the high density rezoning for this project was approved in May 2012, Zinkin and Burns were still one month shy of having any voting powers on the town council.

Villas at San Dorado ~ 274 apartments:
This rezoning was approved in April 2012. That’s right… Zinkin and Burns were still not on council and Bill Garner was absent that night. Yet the writer claimed that all three of them voted to approve it! When the Conceptual Site Plan was approved in November 2012, Zinkin and Garner were opposed.

Then council member, now current council candidate, Steve Solomon voted to approve all of these:
  • Encantada: Solomon approved the rezoning, the Conceptual Site Plan, and the Architecture Plan.
  • El Corredor: Solomon approved the Major General Plan Amendment and the rezoning that followed.
  • Villas at San Dorado: Solomon approved the rezoning. He lost his bid for re-election the following month.
If you want to protect what’s left of our scenic views, and you want YOUR VOICE to continue to be heard, please join me in re-electing Brendan Burns, Bill Garner, and Mike Zinkin to the Oro Valley Town Council.

Diane Peters
Oro Valley Resident

Monday, August 22, 2016

Guest View ~ Diane Peters: What you need to know about Bill Rodman


Bill Rodman is a former Oro Valley Planning & Zoning Commissioner (2012-2015) who is hoping to unseat one of the incumbents (Brendan Burns, Bill Garner, Mike Zinkin) on the Oro Valley Town Council. What does Bill Rodman bring to the table?


Rodman’s views on the golf course
When Rodman was asked by two local newspapers how he would handle the financial problems of the Community Center golf courses, he responded:
  • “Provide the oversight necessary to make sure that we’re analyzing it properly.” 
  • “If at some point the expenses continue to outstrip the revenues…the golf courses can be closed, partially closed, leased or sold to a third party, and/or made open space.”
Of note is that neither of these “solutions” are new. First of all, Councilmembers Burns, Garner, and Zinkin have been providing financial oversight since the golf courses opened in May 2015 only to be chastised by the Majority-4 for doing so.

Secondly, Councilmembers Burns, Garner, and Zinkin have already proposed closing or partially closing the golf courses, they’ve proposed leasing one course back to the Hilton (which is allowed per the existing contract), they’ve proposed looking for private entities to lease the other 18-hole course, and they’ve proposed turning one or more courses into a linear natural greenway/park. These are the exact same solutions that Rodman is now proposing.

Isn’t it interesting that the Majority-4 are endorsing Rodman when his “ideas” are to simply replicate what Burns-Garner-Zinkin have already been doing or suggesting all along?

Rodman also stated at the August 10th Candidate Forum that the council shouldn’t make any decisions on the golf courses because, “I believe there is a 5-year plan.” Is Rodman aware that Troon’s own forecast continues to show expected losses of $1.4 million dollars in year-five? Can we even trust that figure when the first year was expected to lose $1.5 million and it actually lost $2.4 million? That forecast was off by almost $1 million dollars!

Rodman’s voting record on Planning & Zoning
On Rodman’s Facebook page, he states: “I spent 4 years on Oro Valley’s Planning & Zoning Commission, serving as Chair, advising the town on how to manage growth and make good decisions.”

Below is a sample of the items that Bill Rodman approved while on P&Z. Is this your idea of managed growth and good decision making?

2015
  • Increased building heights at Linda Vista and Oracle (El Corredor) within the Oracle Rd. Scenic Corridor District (obstructing mountain views)
  • General Plan Amendment, ESL Amendment, and Rezoning for a 5-story retirement community (Nakoma Sky) on 79.5 acres at 1st Ave. and Naranja
  • Increased illuminated window signs for businesses
  • CUP for a Fry’s gas station at 1st Ave. and Oracle Rd.
2014
  • Rezoning of the 39-acre Olsen property from R1-144 to Planned Area Development
  • LaCholla Major rezoning, convert 45 acres from R1-144 to R1-7 at LaCholla and Naranja
  • Amended zoning code to allow property owners to grade right up to the adjacent property
  • Rezoning 149 acres at Tangerine and First Ave. from R1-144 to MDR and commercial
2013
  • CUP for U-Haul business at Ace Hardware on First and Tangerine
  • Rezoned NE corner of Tangerine and LaCholla from R1-144 to Commercial and NCO
  • Major General Plan Amendment of Olsen property from LDR and open space to MDR
  • Major General Plan Amendment of Miller Ranch from LDR to MDR
2012
  • Rezoned 13 acres at NE corner of Linda Vista and Oracle (El Corredor) to HDR (The Canyons Apts.) 
  • Major General Plan Amendment for NE corner Tangerine and LaCholla from LDR to NCO
Were these “good decisions?” Is this how you “manage growth?” By turning every remaining low density residential parcel into medium density or high density or commercial?

Summary
A vote for Rodman (as well as Pina and Solomon) will result in an abundance of 7-0 votes on council with no discussion or debate, no adherence to the voter-approved General Plan, more rezonings to appease greedy developers, and millions of dollars in continued golf losses.

Diane Peters
Oro Valley Resident

---
This article was submitted directly to us by Diane. She also submitted it to the Arizona Daily Independent where it was published last week. We publish it here to insure complete coverage of this election.
---

Friday, August 14, 2015

Bits and Pieces


$53,756.46

That is what the town spent in legal fees to defend the law suit on its rejection of a voter referendum on the purchase of the El Conquistador Country Club.

Tangerine Road Widening Construction Begins Early in 2016

The Town of Marana is the lead agency for the Tangerine Road widening project. They have chosen a contractor and are currently 90% complete with their plans. According to project manager Jose Rodriguez,the community should start seeing the utility and communication construction process starting somewhere around September or October of this year. The actual road construction should then begin in January or February of next year.

The Oro Valley Scenic Corridor: Kneader's Bakery Coming To Oro Valley
Apparantly, the business community thinks Oro Valley nees yet another "Bakery-Cafe." This time it's "Kneaders". It will be on the east side of Oracle Road, south of Linda Vista. It will be in front of the apartments called "El Corredor." Kneaders will be about 4,100 square feet. It will have inside and outside eating as well as a drive thru.

Kneaders is a franchise chain, operating in some Western states. It has one location in Tucson on Wilmot. Offerings include such healthy delights as their several "Kneaders Famous" sandwiches, the all important Panini in various 'ingredients', a crab roll, and a Tuscan sandwich.

The restaurant will be sited within 100 feet of Oracle Road.

Can anyone explain to us what happened to maintaining Oracle Road scenic corridor?

Kneaders will likely bring yet more low paying retail jobs to our community.

Hornat Contributes To Tucson Politics
Earlier this year, Oro Valley council member Joe Hornat contributed $100 to the PAC of City of Tucson Ward 4 council member Shirley Scott. According to our source, an individual who is very savvy about the politics of Tucson: "Shirley has been on the Tucson council for almost 2 decades and is considered to be one the main architects of its demise. It is interesting to see that Hornat wants to see 4 more years of one of the region's worst elected officials."

Oro Valley Fall Parks and Rec Guide available online
"The Fall 2015 Parks and Recreation Program Guide is the Town of Oro Valley's biggest edition ever, with expanded recreational offerings including golf, tennis, personal training, aquatics, archery, kids' camps, art and more! With the addition of the Oro Valley Community & Recreation Center, there are now more activities and special events to enjoy." View it here.

Wednesday, August 9, 2017

Editorial ~ The Voting Record of the Oro Valley Town Council “Majority-7” (Part 1.)

This is the first of a 3-part series where we will present the voting record for the new Oro Valley Town Council beginning with their first council meeting on November 16, 2016 and ending June 21, 2017 (the last meeting of the fiscal year which ended on June 30th). There were many more votes than what is presented below, but in the interest of space, we have expounded only on the most important items.

A total of 12 meetings were held. With the exception of one vote, all votes were approved unanimously; the majority of them with little to no discussion. (So much for their claims of being “independent thinkers.” They really should call themselves “The Rubberstamp Council.”)

November 16, 2016

The three new council members (Rhonda Pina, Bill Rodman, Steve Solomon) were sworn in.

Regular Agenda Items

Amending the GP land use map at Rancho Vistoso Blvd. and Vistoso Highlands Drive from neighborhood commercial/office to medium density residential for 17.8 acre property. Major General Plan amendment.

Of note is that during the 9/2/16 meeting, this agenda item was moved to tonight’s meeting at Mayor Hiremath’s suggestion. Applicant Paul Oland of the WLB Group agreed. That way, the new council would be seated when this vote was taken and there would be no discussion on the item. With former Councilmembers Burns, Garner, and Zinkin no longer there to speak for the citizens, this Major General Plan amendment would be easily approved.

Also of note, the new General Plan was just approved by the voters on 11/8/16. Just 8 days later, they are looking to amend it.

A portion of former Mayor Paul Loomis’ speech that evening:
“What I do want to highlight is that you’re amending the General Plan even before the vote has been certified. Past policy was to not allow amendments in the year of revisions or for a year after voter approval.”
Despite this well-reasoned plea by non other than our former mayor, Rodman motioned to approve. Waters seconded.

Motion carried 7-0 with MINIMAL discussion.

Allowing the use of ESL flexible design option for a modified review process for above property.

Rodman motion to approve. Snider seconded. Motion carried 7-0.

Conceptual site plan for Alterra at Vistoso Trails subdivision. Half-mile east of Rancho Vistoso Blvd. and Moore Road.

Waters motion to approve. Solomon seconded.

Motion carried 7-0. NO DISCUSSION.

Proposed grading exception for the Sanctuary at Silverhawke subdivision near NE corner of First and Naranja. (East side of First at Naranja traffic light).

The rolling hills are 19-20 feet high from the intersection. Town Code does not allow grading in excess of 6 feet. Applicant requested to grade 12-15 feet in order to build a straight access road into the development.

Solomon motioned to approve. Hornat seconded.

Motion carried 7-0. NO DISCUSSION.

All motions carried 7-0.

December 7, 2016

Don Cox’s appointment to Planning & Zoning Commission (Consent Agenda)

NO DISCUSSION despite the council receiving letters of concern from multiple residents about his repeated inappropriate and unprofessional behavior while serving past terms on P&Z.

Approving conceptual architecture and landscape plan for 8000 sf commercial building at El Corredor, NE corner of Linda Vista and Oracle.

Both items approved 7-0 with NO DISCUSSION.

Regular Agenda

Tonight’s agenda contained 7 items. Six of them passed 7-0.
(Hornat was opposed to El Con HOA using golf course property for a shed.)

January 4, 2017

Meeting was over in 6 minutes! Two motions made. Both carried 7-0.

January 18, 2017

Agreement between TOV and RTA for a pedestrian and traffic signal on LaCanada at the entrance to the Community Center. (Consent Agenda, Item D.)

Finally, we have some discussion!

Councilmember Pina asked about the $500,000 price and if there were cost overruns, what would be the impact to the town? Paul Keesler (Director of Community Development and Public Works) responded that there are 3 things that can cause a project to go over.

1. During the bidding process, once the Intergovernmental Agreement (IGA) is authorized by the town council, if the lowest bid comes in over $500,000 the town is not required to make up that difference. The RTA would have to increase the budget with approval from their management board or the project could be canceled. Chances are with an RTA project, particularly a safety project like this, they’re not going to cancel it, so on the off chance that the bids come in high, the RTA covers it.

2. Once the contract is signed and the contractor has begun work, if some unforeseen condition arises which could push it over the budget, the IGA makes accommodations for that. If it’s within 10%, the RTA staff can approve it. If it’s over 10%, it would go to the RTA board to get approved for that overage.

3. The only time the town is on the hook for this is if during the project, we add an element not anticipated by the town such as a sidewalk or extra street lights.

Vice-Mayor Waters asked what kind of light will it be.  Paul Keesler responded:

Originally it was going to be a HAWK signal just for pedestrians. But we also have a sight visibility issue with people coming out of the Community Center having a hard time seeing the traffic coming north. Rearranging the landscaping didn’t help so the Town went back to the RTA and got this budget approved for not only a pedestrian crossing but also a traffic signal.

Motion to approve by Pina. Seconded by Snider.

Motion carried 6-0. Mayor Hiremath was absent.

Discussion and possible direction to staff regarding future Community Center elements.

Town Council directed staff to hire a consultant to review options available for the CC restaurant facility and the configuration of the golf course, and to prepare a Request for Proposal (RFP), solicit bids, and return to Council with the information received from those requests.

Approving the final plat for the Sanctuary at Silverhawke, residential subdivision located at the NE corner of Naranja and First.

Motion carried 6-0. NO DISCUSSION.

All motions carried 6-0.

Part 2 will be published next Wednesday, August 16th.

Monday, January 5, 2009

Marriot Hotel Planned For NE Corner Oracle Rd. & Linda Vista Blvd.

NOTICE OF NEIGHBORHOOD MEETING


The applicant, Sunway Hotel Group Inc. will be hosting a neighborhood meeting on

Monday, January 5, 2009, 6:00 p.m.
Development Services Building, Hopi Room, 11000 N. La Canada Dr.
Oro Valley, Arizona

OV8-08-03, Sunway Hotel Group Inc., represented by Manning Construction, requests approval of a conditional use permit for the Marriot Springhill Hotel, located within the southern portion of the El Corredor Development, at the northeast corner of Oracle Road and Linda Vista Boulevard.

All Boards, Commission and Council members are invited to attend. For questions and additional information, please contact David Ronquillo, Senior Planner, at (520) 229-4817 or dronquillo@orovalleyaz.gov.

Friday, March 10, 2023

Bits and Pieces

Kneaders says "Thanks for your support"
The parent company and operator of the Kneaders Restaurant located in the El Corredor Center on Oracle Road has permanently closed this location. According to the owner, the store did not meet its operating objective. We will miss it since we conducted the majority of our interviews there.

This, from Kneaders management: "We thank our loyal guests for their continued support and apologize for the inconvenience of our recent store closing in Oro Valley. We are dedicated to success in every market and this particular site did not meet the anticipated expectation in the region. We remain committed to offering the best service possible to our guests. While we know our next closest location is a ways away, we would love to see our faithful guests visit our other Arizona locations when they are in the area." (Source: Kneaders email to LOVE)

Classical Music Sunday at Riverfront Park
"The Town of Oro Valley and the Southern Arizona Arts and Cultural Alliance have partnered to bring classical music to residents since 1997. The Oro Valley Riverfront Park Classical Concert Series supports some of the finest classically trained musicians with the opportunity to perform monthly in the community’s largest outdoor amphitheater.” The next concert is Sunday from 4-5:30 pm at Riverfront Park. Bring chairs and blankets. There will be a food truck. (Source: Town of Oro Valley Economic Development March Report)

Colorado River reservoirs at 34% capacity
The Arizona Department of Water Resources has posted a dashboard of information regarding Colorado Water. We have added a link in the right panel for it. Another source of future river water status is the amount of snowfall in Grand Lake Colorado. (See our report on this).  Good news: "22/23 snowfall [in Grand Lake] is 11% higher than the historical average this far into the winter." That should improve the rather bleak current situation [panel right].

Oro Valley housing growth continues to slow… should impact construction sales tax revenues
The town issued one permit for a single-family residence (SFR) in February. This continues a the three year downward trend in SFR permits issued that we noted in February. The most recent decrease in SFR permitting activity is not unique to Oro Valley. Oro Valley’s permit issuance results mirror the slowdown in new home growth nationally. Economic “experts” tell us that the slowdown is the result of increased mortgage interest rates. The baseline interest rate is being increased by the Federal Reserve in an attempt to combat rising inflation (caused by increased government spending).  An increase in this base rate increases all interest rates. Experts expect the Federal Reserve to increase the base rate quarterly for at least another year, thus further increasing mortgage lending rates; which, in turn, will depress new home buying. That will result in a decrease in an important piece of Oro Valley’s continuing income, construction sales tax revenues.

Property Taxes: Pima County Sends out "Notice of Value" with massive FCV increased.. but property tax base up much less
If you a home in Oro Valley, you should have received a "Notice of Value" from Pima County. The notice gives you the county's determination of your property value for 2024. The full cash home value (FCV) for one neighborhood increased 27%. It increased 20% last year. We suspect that it's the same throughout the county. For many years prior to that, the FCV had increased from 2 to 3%.  The good news is that property taxes are based on the limited cash value (LCV) which is also shown on the notice. By law, the LCV can not increase by more than 5% per year.  Want to see the FCV and LCV for others in your neighborhood? Visit this link.
 
La Cañada Drive asphalt replacement project begins March 13, drivers should expect delays 
"Construction on La Cañada Drive between Tangerine and Moore Roads will begin March 13, with contractor Sunland Asphalt removing and replacing the existing top two inches of asphalt. Road restrictions will be in place on La Cañada Drive with speed reduced to 25 mph. Drivers should expect delays. Please see details below. The majority of the work and delays will be through March 17 to align with Leman Academy’s spring break, so as to lessen construction impact on motorists. After March 17, ancillary work will continue until April 17 with minimal disruption to traffic." (Source: Oro Valley Media Release)
- - -

Thursday, June 18, 2020

Guest View-Jack Stinnett: Bill Rodman Is Proven Leader of "Over-development"

Rodman's voting record fostered Oro Valley Over-Development
During the early Hiremath years, Council Member Bill Rodman sat on the Planning and Zoning Commission. These are years in which Oro Valley moved toward over-development. Rodman was at the epicenter of it all.

Rodman's record shows that he is a proven leader in over-development. From 2012-2016, while on the Planning and Zoning Commission. Rodman demonstrated his bias by approving wealthy land owner and developer requests.

Want proof? Just look at his voting record while on the Planning and Zoning Commission
During these years, Rodman rarely saw a General Plan amendment or rezoning he did not like. Rodman approved the following while he was on the Planning and Zoning Commission:
  • Increased building heights for El Corredor apartments; 
  • Approved a General Plan Amendment, ESL Amendment, and Rezoning for a 5-story retirement community (the abandoned Nakoma Sky project) on 79.5 acres;
  • Voted to approve rezoning 45 acres from R1-144 to R1-7 (144,000 sqft to 7,000 sqft lots) on Naranja near La Cholla; 
  • Approved rezoning 149 acres at Tangerine and First Ave ["Kai" property] from 3 acre lots to Medium Density Residential and commercial; 
  • Supported a Major General Plan Amendment of the Olsen property from Low Density Residential and open space to Medium Density Residential.
This is  just a sample. 

Rodman has continued his over-development stance while on council
Rodman brought his over-development bias with him when he was elected to Town Council in 2016. From 2016 to 2018, while Hiremath was in control of council, Rodman approved thirteen General Plan amendments and/or rezoning requests. Indeed, he voted for one of these General Plan Amendments while he was a council member for less than three hours!

The only reason Rodman has not shown his over-development bias in the past two years is that you, the voters, replaced the Hiremath council with a council that was far more resident friendly, and far less developer friendly.

We need leaders who put the people first
Yes. Incumbent Bill Rodman has demonstrated “proven leadership” but unfortunately it’s been directed at steering developer projects through and around Oro Valley’s General Plan process, Environmentally Sensitive Lands rules, and town zoning codes.

This might be a good thing for developers.

But it is a bad thing for the residents of Oro Valley.

Let’s be sure to elect council members that place residents, not developers first.
---
Jack Stinnett is an Oro Valley resident. He graduated from the U.S. Naval Academy and served on Minesweepers and Destroyers. After his military service, Jack was employed as an engineer and plant manager in the Nuclear Power industry, a factory manager in the automotive industry, and Vice-President of a worldwide engine components business. Jack finished his career as President and CEO of Morris Material Handling in Milwaukee. He and his wife, Connie, moved to Oro Valley in 2011. Jack was a member of Oro Valley Parks and Recreation Commission from 2012-2014, serving as Chairman in 2013-2014. He enjoys woodworking, biking, and visiting his grandchildren.

Monday, February 21, 2022

Romspen received $4.25 million for the former Vistoso Golf Course

The beginning of a 202 acre preserve
Friday’s announcement by The Conservation Fund that they purchased the former Vistoso Golf course was fantastic news for the community. It marked the end of a long and difficult negotiation with the property owner. More importantly, however, it marks the beginning of a 202 acre nature preserve for everyone in the community to enjoy.

We plan to tell the story of how this all came about. It is indeed a very complicated story.

Today, we start our story with the result: The settlement agreement that was signed for the purchase of the property.

Resulted from a deal that required a “settlement agreement”

“A settlement agreement is a legal contract that resolves the disputes among all parties by coming to an agreement. It is a legal document where all parties in a court case, in civil law, agree to an outcome of any judgment being made in advance.” (https://www.legalmatch.com/law-library/article/what-is-a-settlement-agreement.html). When it comes to the Vistoso Golf Course, there are many issues that needed to be resolved. The most important of which was what development was going to be allowed on the property. There is after all a 6+ acre parcel that is already zoned for apartments. Then there is the 202 acre golf course including a clubhouse that could have been potentially used for a variety of purposes. The settlement agreement states exactly how all of this was resolved.

The deal has six key elements
  • 202 acres will be a permanent nature preserve.That is the golf courses.
  • 6+ acres, the clubhouse area, will house proximally 132 apartments
  • The apartments will be no higher than two stories. The property is zoned for up to a three-story apartment building.
  • A small portion, roughly 1 acre, adjacent to the the 6+ acres will be available for use for parking for the apartments.
  • No county recapture of property taxes will be incurred by any party as a result of the sale.
  • Romspen will receive funds as detailed in the panel at right
There are four participants in the deal
Romspen (Vistoso) LLC
Romspen LLC is the owner of the property. They purchased it in 2012 in a bankruptcy proceeding. They operated the golf course until 2016. They shut it down and proceeded to spend the next five years concocting various ways to parse the property for development. They received $4.25 million for their effort.
Ross Rulney
Ross Rulney is a Tucson based developer. He developed "El Corredor" which is located at Oracle and Linda Vista. It is a mixed-use development. Rulney took over that property from a company that was trying to build a motel there. They went out of business.  Rulney is going to build the apartments.. He paid $1.75 million to buy the property. 
The Conservation Fund 
The Conservation Fund ("TCF") is the entity that now owns a golf course. They will be donating it to the town once they find a conservator to manage the settlement agreement such that nothing other than a natural preserve will ever exist on the property. Through the efforts of the residents, TCF raised donations sufficient to pay Romspen $1.615 million. That was the appraised value of the land.
Town of Oro Valley
The town of Oro Valley is the fourth participant in the transaction. The town agreed to pay $885,000 to settle all remaining “disagreements.”  This resolved a "legal dispute."

- - - 
Want to learn more? Read the Settlement Agreement here.